Yokogawa upgraded version of device management wizard started to support Chinese

Yokogawa upgraded version of device management wizard started to support Chinese In January 2011, Yokogawa Electric Corporation released the FieldMate Multifunction Device Management Wizard R2.03 upgrade for use in factories and other production-related facilities. New features of the product include:

Supports Chinese. In order to adapt to the fast-growing Chinese market, FieldMate has added support for Chinese based on the support of Japanese and English as a standard configuration in order to occupy a larger share in the fast-growing Chinese market. The company also plans to add support for other languages ​​in the future.

Supports on-site wireless communication standards. The new version also supports the ISA100.11a field wireless communication standard, which is rapidly gaining market recognition. FieldMate supports all major field communication protocols, allowing customers to manage multiple devices and select field sensors from different vendors.

· Basic version is free. Since March 2011, FieldMate has released a basic version control engineering network that includes sensor setup, adjustment, and management capabilities. Users can download it from Yokogawa's official website for free.

For more information, visit the Yokogawa official website.

Crane Pendant

Wireless Remote Control for Crane Parts does not take up floor space. Crane Pendant allows for independent control of crane operation by operators. This ensures improved operating accuracy and constant Overhead Crane motion without stop.


Product Features:

  • Comply with the safety standard EN954-1 Catalog 4.This standard is generally recognized as the highest of all crane-related safety standards.
  • One emergency stop
  • Rechargeable NI-MH battery with no memory effect
  • Rugged plastic enclosure with IP65 rating
  • Active and passive emergency stop systems for quick response and ultimate protection
  • Machine status monitoring and address code rectification are performed by using communication protection and initial start-up protection.
  • Under abnormal operating conditions where the transmitter system incurs problems such as power supply under voltage or signal dropout, the receiver system would automatically stop working with a responding time no more than 0.55 seconds.

Crane Pendant,Crane Pendant Control Station,Pendant Control with buttons

Eurocrane (China) Co., Ltd. , https://www.craneparts.pl