Flotation machine test precautions

(1) Before the no-load operation and the precautions for the test.

1) Turn the vertical axis to check if any foreign objects are stuck;

2) Check whether the slurry level adjustment device is flexible;

3) Check the amount of oil at each lubrication point;

4) Check whether the vertical axis and the number of squeegee rotations meet the design requirements;

5) The tank body is filled with water for leak test;

6) Filled with clean water test, continuous operation for 2h, no card touch; bearing temperature rise does not exceed 40 to 50 degrees.

(2) For 4 hours of load test operation, the slurry concentration, ore supply, air volume, and matching of the chemicals should meet the process requirements.

(3) Normal operation.

Timing Belt For PORSCHE

Automobile Timing Belt Porsche 944,Machine Timing Belt Porsche 944,Timing Belt Porsche 944,Automobile Timing Belt Porsche 928

ZHEJIANG AOSITE AUTO PARTS CO.,LTD , https://www.aositebelt.com