High Speed Track Cutting Roofing Roll Forming Machine

Model NO.: YX25-144-1010
Customized: Customized
Advantage: Use Widely
Condition: New
Color: Blue and Yellow
Speed: 30m/Min
Trademark: SAIBO
Transport Package: Suitable for Sea Packing
Specification: CE, SGS
Origin: Jiangsu, China
HS Code: 84552210

High Speed Roofing Roll Forming Machine
1. Profile drawing:
High Speed Track Cutting Roofing Roll Forming Machine

2. The Chart of Process Flow
High Speed Track Cutting Roofing Roll Forming Machine 
3. Main Specification

Item NO  
Description
 
Offered specification
  Roll Forming Machine YX25-144-1010
  Material Width 1250mm
  Rolling Speed 20-30m/min(not include cutting time)
  Rolling Thickness 0.3-0.7 mm GI up to 235Mpa
  Control System PLC  (Panasonic) as list in the note
  Un Coiler 5 ton hydraulic de-coiler
  Roller Stations About 20 stations
  Roller Material 45# forge steel,coated with chrome
  Shaft Material and DIA ¢70mm, material is 45# forge steel
  Maim Motor Power 15kw
  Hydraulic Station Power 5.5kw
  Hydraulic Pressure 10-12Mpa
  Mode Of Cutting Track cutting without stopping, material is Cr12Mov quenching 58-62ºC
  Auto stacker 12 meters
  Structure Iron cast
  Tolerance 3m+-1.5mm
  Electric Source 380V, 50HZ,3 phase
Also can satisfy customer's require
  Way Of Drive Gear box
  Color Of The Machine Yellow and blue
  Size of the machine L*W*H   around 8.5m*1.7m*1.6m
  Container Need 1 x40 feet



4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation

5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!

Â