Zhoushan COSCO Shipyard's second 152,000 tons shuttle tanker realizes main hull forming

On the evening of June 10, Zhoushan COSCO Shipyard completed the main hull molding for the second 152,000 tons shuttle tanker built by Norwegian Counason. The project node was five days ahead of schedule and was shortened by 58 days compared to the first ship owner's hull.

         It is reported that the project is 276.3 meters long, 46 meters wide and 17.5 meters deep. The designed load is 152,000 tons and the designed speed is 14.6 knots. It is a single-axis single-propeller propulsion infinite area driven by diesel engines. It can load flash points below 60. °C crude oil or refined oil, into the DNV-GL classification society.
 
         Since the project was laid down on March 12 this year, the project team has carried forward the "four special" tradition and worked together to overcome the effects of rainy weather and heavy production resources, and continuously maintained and completed the specified various node indicators in advance. With the formation of the main hull of the 152,000-ton shuttle tanker, the project team will move toward the goal of the docking node after fifteen days.

This generation of biomass fuel Pellet Mill with big gearbox, with advantage as follow:

1-all gears flat connecting no taper gears, structure more properly than before, 

2-and gears more bigger and tronger than before, roughly no need change the gears , 

3-the motor shaft and the machine main shaft directly connecting into the gearbox, so machine transmission efficiency is more higher than before. 

Pellet Machine

Pellet Machine,Grass Pellet Machine,Lucerne Pellet Press,Wood Pellet Mill Making Machine

Jinan Shanghangda Machinery Co., Ltd. , https://www.jinanshdmachine.com